North Park Pedestrian Bridges

Project Info

  • Construction Date

    2017

  • Building Type

    Replacement of Pedestrian Bridges

Project Description


The project was initiated because two existing bridges within the park system had reached their end-of-life-cycle and required replacement.

The existing bridges were demolished and replaced with two new weathering steel bridges. The Design work included bank stabilization; design of new bridge approaches, to accommodate maintenance vehicles; and landscape work.